Ground floor apartment for sale in Vera with garden

268.000 €Vera, 3 beds, 86 mts² built

Discover the ultimate coastal lifestyle in these brand-new bungalows in Vera Playa, located in the exclusive Pueblo Salinas urbanization. Just 2 km from the Mediterranean Sea, this project combines modern architecture with the relaxed atmosphere of southern Spain—perfect for those dreaming of a stylish home under the sun.

This small-scale residence consists of 18 high-quality bungalows with 2 or 3 bedrooms and 2 bathrooms. The ground floor properties feature a private garden, ideal for outdoor dining or relaxation. The upper-floor homes offer a spacious solarium with a summer kitchen, pergola, and solar panels—the perfect place to enjoy the sun and the views.

Read more

Inside, you will find bright, open living spaces with a modern kitchen equipped with built-in appliances, LED lighting, motorized shutters, and elegantly finished bathrooms with a glass shower screen and towel radiator. Thanks to the aerothermal system and pre-installation for air conditioning, you will enjoy maximum comfort and energy-efficient living.

The residence offers excellent amenities, including a large communal swimming pool, private parking space, and storage room for each property.

Vera Playa is a popular coastal town with wide sandy beaches, cozy restaurants, and a relaxed lifestyle. Everything is within easy reach: Desert Springs Golf Resort (8 km), Garrucha (6 km), and Mojácar (10 km). Almería airport is just an hour’s drive away.

Experience the best of the Costa de Almería in these modern bungalows. Schedule your viewing today and be surprised by this unique residential project.

Reference
C041-D27-A32
Type
Apartment
Location
Vera
Beds
3
Baths
2
Build m²
86
Interior m²
80
Terrace m²
42
Construct year
2.027

Additional Features

  • Aerothermics
  • Amenities near
  • Armored door
  • Close to restaurants
  • Close to sea / beach
  • Close to shops
  • Close to town
  • Fitted wardrobes
  • Fully fitted kitchen
  • Garden view
  • Gated community
  • Panoramic view
  • Parking included
  • Private terrace
  • Video entrance

Vera

Get in Touch
Cindy Mannaerts Property Broker +34 672 24 73 86 cindy@akunas.com
Print PDF Brochure

Similar Properties

High quality apartment in secure environment in Vera Playa, Almería

Vera
  • 2 Beds
  • 2 Baths
  • 72 m² Built
298.000 €C041-D19-A22

Penthouse with 2 bedrooms and sea views for sale in Vera

Vera
  • 2 Beds
  • 2 Baths
  • 72 m² Built
298.000 €C041-D27-P22