Penthouse with 2 bedrooms and sea views for sale in Vera
Discover the ultimate coastal lifestyle in these brand-new bungalows in Vera Playa, located in the exclusive Pueblo Salinas urbanization. Just 2 km from the Mediterranean Sea, this project combines modern architecture with the relaxed atmosphere of southern Spain—perfect for those dreaming of a stylish home under the sun.
This small-scale residence consists of 18 high-quality bungalows with 2 or 3 bedrooms and 2 bathrooms. The ground floor properties feature a private garden, ideal for outdoor dining or relaxation. The upper-floor homes offer a spacious solarium with a summer kitchen, pergola, and solar panels—the perfect place to enjoy the sun and the views.
Inside, you will find bright, open living spaces with a modern kitchen equipped with built-in appliances, LED lighting, motorized shutters, and elegantly finished bathrooms with a glass shower screen and towel radiator. Thanks to the aerothermal system and pre-installation for air conditioning, you will enjoy maximum comfort and energy-efficient living.
The residence offers excellent amenities, including a large communal swimming pool, private parking space, and storage room for each property.
Vera Playa is a popular coastal town with wide sandy beaches, cozy restaurants, and a relaxed lifestyle. Everything is within easy reach: Desert Springs Golf Resort (8 km), Garrucha (6 km), and Mojácar (10 km). Almería airport is just an hour’s drive away.
Experience the best of the Costa de Almería in these modern bungalows. Schedule your viewing today and be surprised by this unique residential project.
- Reference
- C041-D18-P22
- Type
- Penthouse
- Location
- Vera
- Beds
- 2
- Baths
- 2
- Build m²
- 72
- Interior m²
- 72
- Terrace m²
- 87
- Construct year
- 2.027
Additional Features
- Aerothermics
- Amenities near
- Armored door
- Close to restaurants
- Close to sea / beach
- Close to shops
- Close to town
- Fitted wardrobes
- Fully fitted kitchen
- Garden view
- Gated community
- Panoramic view
- Parking included
- Private terrace
- Roof terrace
- Sea view
- Solarium
- Video entrance

Similar Properties
Penhouse with 3 bedrooms and solarium in Vera Playa, Almeria
- 3 Beds
- 2 Baths
- 100 m² Built
Penthouse with 3 bedrooms and sea views for sale in Vera
- 3 Beds
- 2 Baths
- 94 m² Built

