FULLY FURNISHED! Penthouse with 3 bedrooms and sea views in Vera

370.000 €Vera, 3 beds, 78 mts² built

New Build Apartments with Sea Views in Vera Playa, Just 650 metres from the golden sandy beach of Vera, these apartments offer an exceptional combination of coastal living and modern comfort. This new residential complex consists of apartments with 1, 2, or 3 bedrooms, all fully furnished and equipped, allowing you to enjoy them from day one. Each property features spacious terraces, many with panoramic sea views; ground floor units also have a private garden, and penthouses come with a private rooftop terrace.

The interiors are designed in a contemporary Mediterranean style, with bright and functional spaces, open kitchens, spacious living rooms, and high-quality finishes. All homes include a parking space and storage room, as well as air conditioning and built-in appliances. Large windows and sliding doors harmoniously connect indoor and outdoor spaces, ensuring a natural transition.

Read more

The communal facilities are excellent, with two swimming pools, landscaped gardens, a padel court, and a multifunctional sports field. With more than 7 km of natural sandy beaches in the immediate vicinity, residents can enjoy water sports, relaxing walks, or simply unwind by the sea. Restaurants, supermarkets, shops, and a water park are a short drive or just a 15-minute walk away, while charming places such as Villaricos, Garrucha, Mojácar, and Vera itself enhance the region’s appeal.

Almería airport is about an hour away, ensuring good accessibility for both permanent residence and holiday use. Whether you are looking for a permanent home, a second residence, or an investment, these apartments in Vera offer the perfect balance between style, comfort, and a prime location on the beautiful Costa de Almería.

Reference
C183-D01-P32
Type
Penthouse
Location
Vera
Beds
3
Baths
2
Build m²
78
Interior m²
70
Terrace m²
104
Pool
Communal
Garden
Communal
Construct year
2.027

Additional Features

  • Aerothermics
  • Air conditioning
  • Amenities near
  • Armored door
  • Close to sea / beach
  • Close to shops
  • Close to town
  • Fitted wardrobes
  • Fully fitted kitchen
  • Fully furnished
  • Garden view
  • Gated community
  • Kitchen equipped
  • Lift
  • Panoramic view
  • Parking included
  • Private terrace
  • Sea view
  • Solarium
  • Storage room
  • Video entrance

Vera

Get in Touch
Cindy Mannaerts Property Broker +34 672 24 73 86 cindy@akunas.com
Print PDF Brochure

Similar Properties

Penhouse with 3 bedrooms and solarium in Vera Playa, Almeria

Vera
  • 3 Beds
  • 2 Baths
  • 100 m² Built
349.000 €C041-D17-P32

Penthouse with 3 bedrooms and sea views for sale in Vera

Vera
  • 3 Beds
  • 2 Baths
  • 94 m² Built
349.000 €C041-D18-P32